Grid Code GC0114: System Operation Guidelines Prequalification Processes
- Content:
- Decision
- Publication date:
- Last updated:
- Industry sector:
- Transmission Network
This proposal seeks to modify the Grid Code to include prequalification processes, as required by the SOGL Regulation. It proposes to introduce a new section titled “Balancing Code 5 Prequalification (BC5)” into the Grid Code.
The Authority approved this modification on 9 May 2019.