Scottish Power - Capacity Market Rules change proposal 3
This submission proposes to extend the rules on permitted connection arrangements for an Existing Generating CMU that is a Transmission CMU so that alternatives to conventional TEC that are thought adequate by the SO can prequalify. An addition to Rule 3.6.3 is proposed.
Proposal rules area
Prequalification Information
Proposal organisation
Scottish Power