Search

Scottish Power - Capacity Market Rules change proposal 3

Publication type:
Change Proposal
Status:
Closed (rejected)
Publication date:
Last updated:

This submission proposes to extend the rules on permitted connection arrangements for an Existing Generating CMU that is a Transmission CMU so that alternatives to conventional TEC that are thought adequate by the SO can prequalify. An addition to Rule 3.6.3 is proposed.

Proposal rules area

Prequalification Information

Proposal organisation

Scottish Power
Print this page