Offshore Transmission Network Review: Decision on asset classification
- Content:
- Decision
- Publication date:
- Topic:
-
Electricity transmissionOffshore electricity transmission
- ➞ OFTO tender rounds
- Industry sector:
- Transmission Network,
- Offshore Transmission Network
This letter outlines our decision on the classification of the assets included in National Grid Electricity System Operator’s (NGESO) first Holistic Network Design (HND) into three categories:
- Onshore transmission (reinforcement)
- Radial offshore transmission
- Non-radial offshore transmission
We set out in this letter the regulatory framework, our decision-making process, and resulting classifications and delivery models for this round of HND assets.