Consultation on our proposal to take forward the reform of Distribution Use of System charges under a separate Significant Code Review on revised timescales
- Consultation status:
- Closed (with decision)
- Publication date:
- Closed date:
- Topic:
-
Electricity transmissionElectricity distribution
- Industry sector:
- Distribution Network
Decision:
This consultation seeks your views on our proposal to take forward the wide-ranging review of Distribution Use of system (DUoS) under a separate vehicle to the Access and Forward Looking Charges Significant Code Review (Access SCR), on a revised timescale.
Procedurally, this entails descoping DUoS from the Access SCR and launching a new, dedicated SCR which would retain the original ‘wide ranging review’ scope of DUoS reforms previously set out in our launch letter.
This consultation is open from 1 November to 6 December 2021.
Responses should be sent to: futurechargingandaccess@ofgem.gov.uk
Respond name
Iishan Low