P356: ‘Aligning the BSC with Grid Code Modification GC0099 “Establishing a common approach to interconnector scheduling consistent with the single intraday market coupling processes set out within Regulation (EU) 2015/1222 (CACM)”
This Modification will align the BSC with Grid Code Modification GC0099, which seeks to introduce a standard and updated Interconnector Scheduled Transfer process to the Grid Code.
The Authority approved this modification on 14 June 2018.