Search

Connection and Use of System Code (CUSC) CMP242: Charging arrangements for interlinked offshore transmission solutions connecting to a single onshore substation

Content:
Decision
Publication date:
Last updated:

CMP242  proposed to amend the electricity transmission charging methodology in Section 14 of the CUSC to introduce charging arrangements for interlinks connecting offshore substations that are connected to a single common substation.

The Authority approved this modification, WACM1, on 10 February 2016.