Connection and Use of System Code (CUSC) CMP242: Charging arrangements for interlinked offshore transmission solutions connecting to a single onshore substation
Decision
CMP242 proposed to amend the electricity transmission charging methodology in Section 14 of the CUSC to introduce charging arrangements for interlinks connecting offshore substations that are connected to a single common substation.
The Authority approved this modification, WACM1, on 10 February 2016.