DPCR5 Regulatory Instructions and Guidance (RIGs) v.3: Notice under Part D of standard condition 49 of the Electricity Distribution Licence – modification of the Cost and Revenue Reporting RIG and the Network Asset and Performance Reporting RIG
- Consultation status:
- Closed (with decision)
- Publication date:
- Closing date:
- Topic:
- Energy network price controls
- Industry sector:
- Distribution Network
Regulatory Instructions and Guidance (RIGs) are provided to electricity network operators to enable them to complete the reporting requirements associated with the current price control arrangements (DPCR5). This runs from 1 April 2010 to 31 March 2015.
Respond name
G Mccafferty