BETTA consultation on Non Standard BMU Configurations associated with Cascade Hydro Schemes and associated GB Grid Code and GB BSC drafting

Consultation
  • Upcoming
  • Open
  • Closed (awaiting decision)
  • Closed (with decision)
Publication date
Industry sector
Transmission Network

This open letter consultation sets out proposed changes to the GB Grid Code and to the GB BSC.

Respond name

sp admin

Respond email