Search

BETTA consultation on Non Standard BMU Configurations associated with Cascade Hydro Schemes and associated GB Grid Code and GB BSC drafting

Consultation status:
Closed (with decision)
Publication date:
Industry sector:
Transmission Network

This open letter consultation sets out proposed changes to the GB Grid Code and to the GB BSC.

Respond name

sp admin

Respond email