Decision Gas Distribution Connection Charging Methodology: (CCM) Least Cost Scheme National Grid Gas (NGG 001)
Decision
This modification seeks to clarify the definition of least cost that is applied to the design solution for a connection to the gas distribution network which is detailed within the Connection Charging Methodology (CCM).