CM052 Connection Charging Modification: ‘Least Cost’ Southern 001

Decision
Publication date
Industry sector
Distribution Network

This modification seeks to clarify the definition of least cost that is applied to the design solution for a connection to the gas distribution network which is detailed within the Connection Charging Methodology (CCM).