Assignment of tasks under Regulation (EU) 2017/460, the European Network Code on harmonised transmission tariff structures for gas (TAR NC)

Decision
Publication date
Industry sector
Transmission Network
Generation and Wholesale Market

TAR NC contains several requirements for which the national regulatory authority (NRA) has to decide whether the NRA or the Transmission System Operator (TSO) will perform a particular task.

This letter to BBL and IUK sets out our decision on which tasks should be performed by the NRA or TSO.