Consultation on Independent Distribution Network Operator (IDNO) / Distribution Network Operator (DNO) boundary equipment and which parties should fund this equipment
- Publication type:
- Consultation
- Publication date:
- Closed date:
- 11 December 2009
- Status:
- Closed (with decision)
Consultation on the equipment used to measure electrical flows between the boundary of DNO and IDNO networks and the funding arrangements for this equipment.
Respond name
Sian Bailey