National Grid - Capacity Market Rules change proposal 17
This proposal from National Grid would remove the requirements to provide metering information and bank details to the Delivery Body during prequalification. Instead it would replace this with requirements to provide such information direct to the Settlement Body after prequalification. Amendments to Rules 3.4.3(a)(i); 3.6.4; 3.9.4; 3.4.1(d) are proposed.
Proposal rules area
Prequalification Information
Proposal organisation
National Grid Electricity Transmission