National Grid - Capacity Market Rules change proposal 10
This submission proposes to amend several aspects within Rules area 3 (Prequalification Information). The proposed changes would substitute the requirement for a description of a CMU with that for the CMU’s address and/or grid reference(s); they would modify the Rules to state that the applicant for a Refurbishing CMU may be the despatch controller; they would clarify that the Rules relating to setting Connection Capacity which apply to existing generators also apply to pre-refurbishment elements of Refurbishing CMUs; they would also clarify the requirement to state the 24 month period which includes the settlement periods in which the CMU delivered its highest output.
Proposal rules area
Prequalification Information
Proposal organisation
National Grid Electricity Transmission