Grid Code E/11: Reactive Despatch Network Restrictions
- Publication type:
- Code modification
- Publication date:
- Last updated:
- Topic:
- Energy codes
- Subtopic:
- Grid code
This proposal would change the Grid Code to allow large embedded generators with a network restriction to provide reactive power services (to zero MVAr).