Grid Code E/11: Reactive Despatch Network Restrictions

Publication type:
Code modification
Publication date:
Last updated:
Topic:
Energy codes
Subtopic:
Grid code

This proposal would change the Grid Code to allow large embedded generators with a network restriction to provide reactive power services (to zero MVAr).