Green Frog Power - Capacity Market Rules change proposal 3
This proposal from Green Frog Power Ltd, would amend Rules so that the Delivery Body is able to conduct random site checks to ensure that the metering configuration and other site details are as outlined in the Capacity Register. A new Rule 12.3.1(d) is proposed.
Proposal rules area
Monitoring
Proposal organisation
Green Frog Power