Green Frog Power - Capacity Market Rules change proposal 3

Change Proposal

Publication date

This proposal from Green Frog Power Ltd, would amend Rules so that the Delivery Body is able to conduct random site checks to ensure that the metering configuration and other site details are as outlined in the Capacity Register. A new Rule 12.3.1(d) is proposed.

Change proposal status

Closed (rejected)

Proposal rules area

Monitoring

Proposal organisation

Green Frog Power