Search

Green Frog Power - Capacity Market Rules change proposal 3

Publication type:
Change Proposal
Status:
Closed (rejected)
Publication date:
Last updated:

This proposal from Green Frog Power Ltd, would amend Rules so that the Delivery Body is able to conduct random site checks to ensure that the metering configuration and other site details are as outlined in the Capacity Register. A new Rule 12.3.1(d) is proposed.

Proposal rules area

Monitoring

Proposal organisation

Green Frog Power
Print this page