Green Frog Power - Capacity Market Rules change proposal 1
- Publication type:
- Change Proposal
- Status:
- Closed (accepted)
- Publication date:
- Last updated:
This proposal from Green Frog Power Ltd, would amend Rule 3.4.3 (a) (i) to clarify that the description and location of the CMU should include a specific address, a site plan, and a satellite photo (e.g. Google Maps).
Proposal rules area
Prequalification Information
Proposal organisation
Green Frog Power