Search

Grid Code GC0075: Hybrid STATCOMs/SVCs

Publication type:
Code modification
Last updated:
Topic:
Energy codes
Subtopic:
Grid code

This modification seeks to amend the Grid Code to clarify the continuous voltage control requirements applicable to Power Park Modules so that Hybrid STATCOM/SVC solutions can be deployed without eroding dynamic voltage control capability available to the System Operator.

The Authority approved this modification on 10 May 2016.