Grid Code GC0075: Hybrid STATCOMs/SVCs
- Publication type:
- Code modification
- Last updated:
- Topic:
- Energy codes
- Subtopic:
- Grid code
This modification seeks to amend the Grid Code to clarify the continuous voltage control requirements applicable to Power Park Modules so that Hybrid STATCOM/SVC solutions can be deployed without eroding dynamic voltage control capability available to the System Operator.
The Authority approved this modification on 10 May 2016.