Grid Code GC0062: Fault Ride Through
Decision
GC0062 seeks to amend the Fault Ride Through (FRT) requirements in the Grid Code Connection Conditions as they apply to synchronous and asynchronous generators, including a modified ‘voltage duration curve’ and requirements for active power recovery.
The Authority approved GC0062 on 15 June 2016