ECO3 Boiler Assessment Checklist

Publication date
2nd October 2018
Information types
Policy areas

This Boiler Assessment Checklist is designed to assist operatives in assessing whether a boiler should be repaired, replaced or upgraded alongside a primary insulation measure.

The ECO3 Order commenced on 3 December 2018 and runs until 31 March 2022. These documents apply to any measures delivered from 1 October 2018.

For measures installed before this date, suppliers should refer to this document.

Amendments – 10 October 2018 (Version 3.2)

The ECO3 Boiler Assessment Checklist was republished on 10 October 2018 to reflect a number of minor changes which should improve the overall usability of the document.

Amendments - 15 February 2019 (Version 3.3)

This document was republished to account for First Time Central Heating measures under ECO3. A new section was created to capture occasions where heating controls (TRVs) cannot be installed as part of a measure. Suppliers and installers should use version 3.3 of the ECO3 Boiler Assessment Checklist.