Search

Energy code timetable

Proposed dates we aim to approve or reject changes to energy codes.

Energy codes can be changed or updated, for example to remove specific requirements.

We approve or reject energy code modifications. The outcome and reason for each change is published in the list of Energy code publications.

You can get further information on proposed changes to energy codes on the Code Administration Code of Practice website.

Energy code proposed changes

Proposed changes to energy codes that we are reviewing and dates we aim to decide the outcome.

Balancing and Settlement Code (BSC)

Elexon is the Code Administrator for the Balancing and Settlement Code.

There are no modifications to the BSC with us for decision.

Carbon Capture and Storage Network Code (CCS N Code)

The CCS (Carbon Capture and Storage) Network Code body manages the CCS N Code.

Modification reference number Modification title Expected date of decision  Ofgem expect to conduct an IA or consultation

CCS001

 

Clarification of CO2 Venting between Metering Point and Delivery Point TBC No 

Connection and Use of System Code (CUSC)

The National Energy System Operator (NESO) is the organisation responsible for the Connection and Use of System Code

Modification reference number Modification title Expected date of decision  Ofgem expect to conduct an IA or consultation

CMP397 

 

Consequential changes required to CUSC Exhibits B and D to reflect CMP316 (Co-Located Generation Sites)  30 September 2025  No 

CMP315 

 

TNUoS: Review of the expansion constant and the elements of the transmission system charged for  TBC  Yes 

CMP375 

 

Enduring Expansion Constant & Expansion Factor Review  TBC  Yes 

CMP330 

 

Allowing new Transmission Connected parties to build Connection Assets greater than 2km in length TBC  No

CMP374 

 

Extending contestability for Transmission Connections TBC No

CMP432

 

Improve “Locational Onshore Security Factor” for TNUoS Wider Tariffs 6 October 2025 No

CMP344 

 

Clarification of Transmission Licensee revenue recovery and the treatment of revenue adjustments in the Charging Methodology 31 October 2025 No
CMP316 TNUoS Arrangements for Colocated Generation Sites TBC No

Distribution Code (DCode)

The Energy Networks Association is the body responsible for the Distribution Code.

There are no modifications to the Distribution Code with us for decision.

Distribution Connection and Use of System Code (DCUSA)

Electralink is the body responsible for the Distribution and Use of System Agreement

Modification Reference Number  Modification Title  Expected date of decision  Ofgem expect to conduct an IA or Consultation 
DCP446 Emergency Disconnections 14 November 2025 No
DCP412 Discounts from TCR charges for ‘peaky’ final demand customers TBC No
DCP437 To Shorten the DUoS Pricing Notice Periods 10 October 2025 No
DCP439 Backdating Tariff Changes 6 October 2025 No

Grid Code (GC)

NESO is the body responsible for the Grid Code

Modification reference number Modification title Expected date of decision Ofgem expect to conduct an IA or consultation

GC0166 

 

Introducing new Balancing Mechanism Parameters for Limited Duration Assets 31 October 2025 No 

Independent Gas Transporters Uniform Network Code (IGT UNC)

The Independent Gas Transporters’ (IGT) Uniform Network Code (UNC) is the body responsible for the Independent Gas Transporters Uniform Network Code

Modification reference number Modification title Expected date of decision Ofgem expect to conduct an IA or consultation

IGT176

 

Changes to IGT UNC to enable UNC0887 ‘Facilitating Bi-Directional Connections Between IGT Pipelines and the NTS’ - IGT UNC 30 November 2025 No
IGT165 Independent Shrinkage Expert and Independent Shrinkage Charge - IGT UNC TBC No

Retail Energy Code (REC)

The Retail Energy Code Company limited is the body responsible for the Retail Energy Code.

Modification reference number Modification title Expected date of decision Ofgem expect to conduct an IA or consultation

R0216

 

REC Changes to tie in with DCP419 TBC No

Smart Energy Code (SEC)

The Smart Energy Code Company houses the Smart Energy Code Administrator and Secretariat. SECCo is the body responsible for the Smart Energy Code

There are no modifications to the SEC with us for decision.

Security and Quality of Supply Standard (SQSS)

NESO is the body responsible for the Security and Quality of Supply Standard

There are no modifications to the SQSS with us for decision.

System Operator Transmission Owner Code (STC)

NESO is the body responsible for the System Operator - Transmission Owner Code

Modification reference number Modification title Expected date of decision Ofgem expect to conduct an IA or consultation

CM078 

 

STC change for CUSC Modification CMP328 - Connection Trigger Distribution Impact Assessment  TBC   No 

Uniform Network Code (UNC)

The Joint Office of Gas Transporters is the body responsible for the Uniform Network Code

Modification reference number Modification title Expected date of decision Ofgem expect to conduct an IA or consultation

 

UNC0900

 

Amendment to the Gas Quality NTS Entry Specification at Biomethane System Entry Points

 

TBC

 

No

 

UNC0884

 

Extending the PC4 Read Submission Window

28 October 2025

 

No

 

 

UNC483

 

Establishing the Independent Shrinkage Charge and the Independent Shrinkage Expert | Joint Office of Gas Transporters - Gas Governance

TBC

 

No