Energy code timetable
Proposed dates we aim to approve or reject changes to energy codes.
Energy codes can be changed or updated, for example to remove specific requirements.
We approve or reject energy code modifications. The outcome and reason for each change is published in the list of Energy code publications.
You can get further information on proposed changes to energy codes on the Code Administration Code of Practice website.
This page is updated at the end of each calendar month.
Energy code proposed changes
Proposed changes to energy codes that we are reviewing and dates we aim to decide the outcome.
Balancing and Settlement Code (BSC)
Elexon is the Code Administrator for the Balancing and Settlement Code.
Decisions pending
P487: Incentive of BSC Supplier Parties to meet the M15 MHHS Milestone.
Decision date: 11 May 2026.
P441: Creation of Complex Site Classes
Decision date: 5 October 2026.
Carbon Capture and Storage Network Code (CCS N Code)
The CCS (Carbon Capture and Storage) Network Code body manages the CCS N Code.
Decisions pending
There are no modifications to the CCS N Code with us for decision.
Connection and Use of System Code (CUSC)
The National Energy System Operator (NESO) is the organisation responsible for the Connection and Use of System Code.
Decisions pending
CMP453: To Bill BSUoS on a net basis at BSC Trading Units.
Decision date: 30 September 2026.
CMP315: TNUoS: Review of the expansion constant and the elements of the transmission system charged for.
Decision date: to be announced.
CMP330: Allowing new Transmission Connected parties to build Connection Assets greater than 2km in length.
Decision date: to be announced.
CMP344: Facilitating Biomethane entry into the GDN by exporting methane from the GDN into the NTS via Compression | Joint Office of Gas Transporters - Gas Governance
Decision date: to be announced
CMP374: Extending contestability for Transmission Connections.
Decision date: to be announced.
CMP375: Enduring Expansion Constant & Expansion Factor Review.
Decision date: to be announced.
CMP397: Consequential changes required to CUSC Exhibits B and D to reflect CMP316 (Co-Located Generation Sites)
Decision date: to be announced
CMP423: Ensuring non-BM Balancing Services providers pay for non-delivery imbalances at a price that reflects the real-time value of energy.
Decision date: to be announced.
Distribution Code (DCode)
The Energy Networks Association is the body responsible for the Distribution Code.
Decisions pending
There are no modifications to the Distribution Code with us for decision.
Distribution Connection and Use of System Code (DCUSA)
Electralink is the body responsible for the Distribution and Use of System Agreement.
Decisions pending
DCP412: Discounts from TCR charges for ‘peaky’ final demand customers.
Decision date: 7 September 2026.
Grid Code (GC)
NESO is the body responsible for the Grid Code.
Decisions pending
GC0139: Enhanced Planning Data Exchange to Facilitate Whole System Planning
Decision date: to be announced
GC0179: Removal of Balancing Code No.4 from the Grid Code.
Decision date: to be announced.
Independent Gas Transporters Uniform Network Code (IGT UNC)
The Independent Gas Transporters’ (IGT) Uniform Network Code (UNC) is the body responsible for the Independent Gas Transporters Uniform Network Code.
Decisions pending
There are no modifications to the Independent Gas Transporters Uniform Network Code with us for decision.
Retail Energy Code (REC)
The Retail Energy Code Company limited is the body responsible for the Retail Energy Code.
Decisions pending
R0316: Clarification to Data Items within the Payment Method Levelisation Supplier Data Reporting
Decision date: 9 May 2026
RO267: Smart Meter Installation Surveys - Microbusiness requirements
Decision date: 19 June 2026
R0268 Consequential Cross-Code Change for BSC P441 - Complex Site Classes Creation.
Decision date: 5 October 2026.
Smart Energy Code (SEC)
The Smart Energy Code Company houses the Smart Energy Code Administrator and Secretariat. SECCo is the body responsible for the Smart Energy Code.
Decisions pending
There are no modifications to the SEC with us for decision.
Security and Quality of Supply Standard (SQSS)
NESO is the body responsible for the Security and Quality of Supply Standard.
Decisions pending
There are no modifications to the SQSS with us for decision.
System Operator Transmission Owner Code (STC)
NESO is the body responsible for the System Operator - Transmission Owner Code.
Decisions pending
CM078: STC change for CUSC Modification CMP328 - Connection Trigger Distribution Impact Assessment
Decision date: to be announced
Uniform Network Code (UNC)
The Joint Office of Gas Transporters is the body responsible for the Uniform Network Code.
Decisions pending
UNC0918 - Temporary reintroduction of the enhanced pressure service and increased MNEPOR for BBLC (reintroduced by UNC0891 and UNC0859 and introduced by UNC0814).
Decision date: 7 May 2026.
UNC0894/A: Facilitating Biomethane entry into the GDN by exporting methane from the GDN into the NTS via Compression
Decision date: 29 May 2026.
UNC0907 - Extension to current maintenance period
Decision date: 10 June 2026.
UNC0903: The Introduction of a Single NTS Capacity Reference Price.
Decision date: 14 December 2026.
UNC0900: Amendment to the Gas Quality NTS Entry Specification at Biomethane System Entry Points.
Decision date: to be announced.
UNC0915: Debt Relief Scheme Payments (DRSP)s
Decision date: to be announced