OFTO Tender Round 2
Resources, guidance and details for OFTO Tender Round 2
OFTO Tender Round 2 started in November 2010 and was divided into two tranches, A and B. Tranche B started in December 2012. Tender Round 2 enabled prospective bidders to compete to own one or more of the offshore transmission assets associated with:
- London Array
- Lincs
- Gwynt y Môr
- West of Duddon Sands
Tender Round 2 publications
The following publications relate to the tender and award process for Tender Round 2:
- Generic Licence and Guidance for TR2
- Tender Rules for Tender Round 2 (TR2)
- Generic Preliminary Information Memorandum for TR2
- Pre-Qualification Document for Tender Round 2 (TR2)
- Pre-Qualification Document for Tender Round 2 (TR2) Tranche B
- Qualification to Tender Document for Tender Round 2 (TR2)
- Cost recovery methodology for Tender Round 2 (TR2)
- Guidance on the Transfer Agreement for Tender Round 2 (TR2)
- Projects and details for Tender Round 2 (TR2)
- Regulatory instructions and guidance for Tender Round 2 (TR2) licensees
- Outcome of the aggregation exercise for Offshore Transmission Tender Round 2 (TR2)
Offshore transmission assets
London Array
OFTO transmission assets value: £444m
Current status: Licensed OFTO
Installed capacity: 630 MW
Developed by: DONG, E.on and Masdar
Operator: Blue Transmission
Lincs
OFTO transmission assets value: £307.7m
Current status: Licensed OFTO
Installed capacity: 270 MW
Developed by: DONG, Centrica, and Siemens
Operator: Transmission Capital Partners
Gwynt y Môr
OFTO transmission assets value: £351.9m
Current status: Licensed OFTO
Installed capacity: 574 MW
Developed by: RWE, Stadewerke München and Siemens
Operator: Balfour Beatty
West of Duddon Sands
OFTO transmission assets value: £268.9m
Current status: Licensed OFTO
Installed capacity: 388 MW
Developed by: DONG and Scottish Power Renewables
Operator: Blue Transmission