Direction to make modifications to the Regulatory Instructions and Guidance (RIGs) for RIIO-ED1 (version 6.0)

Licence modification

Publication date

Industry sector

Distribution Network

Licence type

Electricity Distribution Licence

 

On 9 March 2020, we consulted on making changes to version 5 of the Electricity Distribution Regulatory Instructions and Guidance (RIGs). These modifications are made for the purpose of clarifying the existing reporting requirements.

This Direction issues these modifications to the RIGs. These modifications will take effect on and from 1 April 2020 and are version 6 of the RIGs.

This notice fulfils our obligation under Part C of Standard Condition 46 (Regulatory Instructions and Guidance) of the electricity distribution licence.

We will be consulting separately on changes to Annex F (Guidance on the guaranteed standards of performance), as well as the corresponding template (guaranteed standards of performance reporting pack).