Connection and Use of System Code (CUSC)

The Connection and Use of System Code (CUSC) constitutes the contractual framework for connection to, and use of, the national electricity transmission system.

The methodologies used to derive the charges that National Grid Electricity Transmission levies for connection to and use of the national electricity transmission system are also set out in the CUSC.

If you wish to discuss whether you need to be a party to this code and how to become one, please contact National Grid Electricity Transmission plc.

Connection and Use of System Code Modifications

Our decisions on proposed changes to this code are included below.

Publications and updates

  • Published: 21st Oct 2014
  • Decisions
  • 1 Associated documents
We have approved this modification to the Connection and Use of System Code (CUSC)

  • Published: 9th Oct 2014
  • Decisions
  • 1 Associated documents
We have approved this modification to the Connection and Use of System Code (CUSC)

  • Published: 3rd Oct 2014
  • Decisions
  • 1 Associated documents
We have rejected this modification to the Connection and Use of System Code (CUSC)

  • Published: 1st Sep 2014
  • Closed: 3rd Oct 2014
  • Consultations and responses, Open letters and correspondence
  • 4 Associated documents
CMP 223 proposes revising security requirements for a subset of distributed generators. Our open letter provides an opportunity for stakeholders, particularly embedded generators, to give their views.

  • Published: 26th Aug 2014
  • Closed: 23rd Sep 2014
  • Consultations and responses
  • 5 Associated documents
Our Impact Assessment on CMP222, which proposes changes to the liabilities and securities that non-generation users face.

  • Published: 27th Jun 2014
  • Decisions
  • 1 Associated documents
CMP225 seeks to make consequential changes to the Connection and Use of System Code (CUSC) to reflect licence changes made to implement the European Third Package.

  • Published: 29th Jan 2014
  • Decisions
  • 1 Associated documents
CMP221 sought to make consequential changes to the CUSC following approval of BSC mod P276 which introduces the concept of a Partial Shutdown and allows market operation to continue during a Partial Shutdown.

  • Published: 19th Nov 2013
  • Decisions
  • 1 Associated documents
CMP220 seeks to introduce the ‘fast track’ self-governance process to the CUSC governance rules to implement Ofgem’s Code Governance Review Phase 2 licence changes which came into effect in August 2013.

  • Published: 13th Sep 2013
  • Open letters and correspondence
  • 1 Associated documents
We have decided that it would be proportionate to extend the consultation period by 2 weeks to assist stakeholders who consider that they need additional time to make their responses.

  • Published: 1st Aug 2013
  • Closed: 10th Oct 2013
  • Consultations and responses
  • 38 Associated documents
This document consults on proposals to amend the electricity transmission charging methodology that have been submitted to us by industry as part of CUSC modification proposal 213 (CMP213). It sets out our impact assessment and minded-to position.