Connection and Use of System Code (CUSC)

The Connection and Use of System Code (CUSC) constitutes the contractual framework for connection to, and use of, the national electricity transmission system.

The methodologies used to derive the charges that National Grid Electricity Transmission levies for connection to and use of the national electricity transmission system are also set out in the CUSC.

If you wish to discuss whether you need to be a party to this code and how to become one, please contact National Grid Electricity Transmission plc.

Connection and Use of System Code Modifications

Our decisions on proposed changes to this code are included below.

Publications and updates

  • Published: 1st Mar 2017
  • Closed: 18th Apr 2017
  • Consultations and responses
  • 4 Associated documents
Industry have raised CUSC modifications CMP264 and CMP265. This impact assessment covers those proposals and their 23 alternatives sets out our minded to decision. We have extended the date for responses to this consultation to 9am on 18 April 2017.

  • Published: 23rd Feb 2017
  • Decisions
  • 1 Associated documents
This letter sets out our decision that the final modification report for CMP261 should be revised and resubmitted.

  • Published: 7th Feb 2017
  • Decisions
  • 1 Associated documents
Decision on urgency for modification proposal to the Connection and Use of System Code (CUSC).

  • Published: 21st Dec 2016
  • Decisions
  • 1 Associated documents
We have approved this modification to the Connection and Use of System Code (CUSC).

  • Published: 21st Dec 2016
  • Decisions
  • 1 Associated documents
Connection and Use of System Code (CUSC) Urgency Decision.

  • Published: 8th Dec 2016
  • Decisions
  • 1 Associated documents
CMP267 aims to defer any unforeseen increases in BSUoS cost arising from an Income Adjusting Event (IAE) by two years when those unforeseen costs exceeds £30 million in a charging year.

  • Published: 2nd Dec 2016
  • Open letters and correspondence
  • 1 Associated documents
This letter sets out our decision that the modification report for CMP268 “Recognition of sharing by Conventional Carbon plant of Not-Shared Year-Round circuits” should be revised and resubmitted.

  • Published: 21st Nov 2016
  • Decisions
  • 1 Associated documents
The Authority rejected this modification on 18 November 2016.

  • Published: 4th Nov 2016
  • Decisions
  • 1 Associated documents
We have rejected this modification to the Connection and Use of System Code (CUSC).

  • Published: 31st Oct 2016
  • Decisions
  • 1 Associated documents
We have approved this modification to the Connection and Use of System Code (CUSC).

Pages