The Connection & Use of System Code under BETTA - Ofgem/DTI Consultation on a CUSC to apply throughout GB

Consultation
  • Upcoming
  • Open
  • Closed (awaiting decision)
  • Closed (with decision)
Publication date
Closing date
Industry sector
Transmission Network

This document reviews the need for a GB CUSC as part of the BETTA reforms and discusses the role of the system operator under it as the party responsible for contracting with users of the transmission system for connection to, and use of the system.

Respond name

A Wentzel

Response documents