CMP301: ‘Clarification on the treatment of project costs associated with HVDC and subsea circuits’
- Publication type:
- Code modification
- Publication date:
- Last updated:
- Topic:
- Energy codes
- Subtopic:
- Connection and use of system code (CUSC)
- Industry sector:
- Transmission Network
This proposal seeks to clarify the treatment of HVDC and AC subsea circuits in the CUSC in line with NGESO’s interpretation of the existing text, and to ensure consistency with onshore circuits.
The Authority approved this modification on 11 June 2019.