Balancing and Settlement Code P347: Reduction in R1 Read Requirement for Half Hourly Sites
- Publication type:
- Code modification
- Publication date:
- Last updated:
- Topic:
- Energy codes
- Subtopic:
- Balancing and settlement code (BSC)
This Modification sought to reduce the read Settlement Performance Level at the First Reconciliation Volume Allocation Run (R1) for Half Hourly (HH) Metering Systems in Measurement Classes “F” and “G” from 99% to 90% until 1 January 2020.