Search

Authority Direction that CMP307 must not be made during the Targeted Charging Review: Significant Code Review

Publication type:
Code modification
Publication date:
Last updated:
Topic:
Energy codes
Subtopic:
Connection and use of system code (CUSC)

Authority Direction that the Connection and Use of System Code proposed modification CMP307: ‘Expanding the BSUoS charging base to include embedded generation’ must not be made during the Targeted Charging Review : Significant Code Review.