Authority Direction that CMP307 must not be made during the Targeted Charging Review: Significant Code Review
- Publication type:
- Code modification
- Publication date:
- Last updated:
- Topic:
- Energy codes
- Subtopic:
- Connection and use of system code (CUSC)
Authority Direction that the Connection and Use of System Code proposed modification CMP307: ‘Expanding the BSUoS charging base to include embedded generation’ must not be made during the Targeted Charging Review : Significant Code Review.