Search

ADE – Capacity Market Rules CP100

Publication date:
Last updated:
Change proposal status:
Closed (accepted)
Print this page

This proposal from ADE seeks to ensure that all CMUs are able to transfer the entire volume of their capacity obligation to another CMU. ADE believes that the existing wording of Rule 9.2.4 may limit the ability of DSR and embedded generation to do this.

Proposal rules area

Transfer of Capacity Obligations

Proposal organisation

ADE