Search

Grid Code GC0062: Fault Ride Through

Content:
Decision
Dyddiad cyhoeddi:
Last updated:

GC0062 seeks to amend the Fault Ride Through (FRT) requirements in the Grid Code Connection Conditions as they apply to synchronous and asynchronous generators, including a modified ‘voltage duration curve’ and requirements for active power recovery.

The Authority approved GC0062 on 15 June 2016