Search

Statutory Consultation proposing removing dates in CRC 7 in respect of directing PPLt and providing flexibility for its recovery

Publication date:
Last updated:
Topic:
Energy network price controls
Industry sector:
Distribution Network
Print this page

A statutory consultation proposing removing the date by which the Authority is required to direct the PPL term. The proposed modifications also provide flexibility in determining the period over which the PPL term is to be recovered.