Search

Consultation on our Minded to Position to assign Transmission System Operator obligations under the Requirements for Generators, Demand Connection, High-Voltage Direct Current, and Forward Capacity Allocation Regulations within GB

Consultation letter setting out our Minded to Position on the assignment of Transmission System Operator (TSO) obligations under the Requirements for Generators (RfG), Demand Connection (DCC), High-Voltage Direct Current (HVDC), and the Forward Capacity Allocation (FCA) Regulations.

Annex 1 sets out our Minded to Position on the allocation of TSO obligations under the RfG, DCC, HVDC and FCA Regulations.

Respond name

Jonathan Whiting

Respond telephone

Subsidiary documents