Minded to decision assignment of TSO Obligations under three EU Network Codes

Content:
Correspondence and other
Publication date:
Last updated:
Industry sector:
Generation and Wholesale Market

Our minded to decision to assign Transmission System Operator (TSO) obligations under the COMMISSION REGULATION (EU) 2017/2195 establishing a guideline on electricity balancing and COMMISSION REGULATION (EU) 2017/2196 establishing a network code on electricity emergency and restoration, as well as our minded to decision on amending our assignment of obligations under Article 70(1) of COMMISSION REGULATION (EU) 2017/1485 establishing a guideline on electricity transmission system operation within GB.

The documents setting out our minded to decision are:

  • The minded to decision letter
  • Annex 1: The GB TSO assignment of obligations for the Emergency and Restoration Code
  • Annex 2: The GB TSO assignment of obligations for the Electricity Balanding Guideline
  • Annex 3: BEIS letter authorising Ofgem to carry out the TSO allocation of tasks under the Electricity Balancing Guideline, the Emergency and Restoration Network Code, and the System Operation Guideline.