Grid Code (GC) GC0117: Improving transparency and consistency of access arrangements across GB by the creation of a pan-GB commonality of Power Station requirements
Code modification
Grid Code Modification GC0177 proposes to address inconsistencies in access arrangements for Power Stations across different regions in Great Britain (GB). This document outlines our decision to send back the modification to the Grid Code Review Panel.