Decision on urgency treatment of 'CM095: Implementing Connections Reform' and 'CM096: Application of Gate 2 Criteria to existing contracted background'
- Publication type:
- Code modification
- Publication date:
- Topic:
- Energy codes,
- Electricity transmission
- Subtopic:
- System operator - Transmission owner code (STC),
- Connections
We have agreed with the Panel's view that CM095 and CM096 satisfy Ofgem's urgency criteria and should be treated as urgent code modifications.