CMP466 Connection and Use of System Code (CUSC) urgency decision
- Publication type:
- Code modification
- Publication date:
- Topic:
- Electricity transmission, Energy codes
- Subtopic:
- Connection and use of system code (CUSC)
- Industry sector:
- Transmission Network
Outcome of request for an urgent review of proposed changes to Connection and Use of System Code, CMP466 'CMP456 consequential Charging Modification'.
We have rejected the request to treat CMP466 as urgent. CMP466 is a consequential charging modification which seeks to introduce arrangements to recover validated costs associated with the development of Electromagnetic Transient (EMT) models through the Balancing Services Use of System (BSUoS) charging framework. CMP466 is intended to operate alongside CMP456.