CMP418: Refine the allocation of Dynamic Reactive Compensation Equipment (DRCE) costs at OFTO transfer
- Publication type:
- Code modification
- Publication date:
- Topic:
- Energy codes
- Subtopic:
- Changes to energy codes,
- Connection and use of system code (CUSC)
On 02 August 2023, Ocean Winds raised CUSC Modification Proposal (CMP) 418. The CUSC Panel subsequently submitted a Final Modification Report (FMR) to us on 08 May 2024. Following a send back on 30 September 2024, the CUSC Panel submitted a second FMR to the us on 11 March 2025. We have decided to reject CMP418 based on the second FMR.