ECO3 Electric Storage Heater Assessment Checklist

Publication date
2nd October 2018
Information types
Policy areas

This Electric Storage Heater Assessment Checklist is designed to assist operatives in assessing whether an ESH should be repaired, replaced or upgraded alongside a primary insulation measure.

The ECO3 Order commenced on 3 December 2018 and runs until 31 March 2022. These documents apply to any measures delivered from 1 October 2018.

For measures installed before this date, suppliers should refer to this document.

Amendments – 10 October 2018

The ECO3 Electric Storage Heater Assessment Checklist was republished on 10 October 2018 to reflect a number of minor changes which should improve the overall usability of the document. Suppliers and installers should use version 3.1 of the ECO3 Electric Storage Heater Assessment Checklist.