RIIO-GD1 Financial Model

Overview

The RIIO-GD1 Price Control Financial Model (‘PCFM’) is used to calculate values for the Base Revenue (the term MOD) that appears in the formula for each licensee’s Base Distribution Network Transportation Activity Revenue.  The calculations are carried out as part of the Annual Iteration Process for the PCFM.

Caveat: The PCFM is designed to produce values for the term MOD by recalculating base revenue figures using revised variable values.  It does not deal with the other components that count towards the licensee’s Maximum Distribution Network Transportation Activity Revenue that are set out in Part B of Special Condition 1B  of the Gas Distribution Licence.  Therefore, the PCFM should not, by itself, be considered a comprehensive model of the allowed revenue position for the licensee.

Annual Iteration Process and functional changes to the PCFM

Each year the table of variable values within the PCFM is revised as part of the Annual Iteration Process in accordance with applicable methodologies contained in the Special Conditions of the Gas Distribution Licence and the GD1 Price Control Financial Handbook.  Functional changes to the PCFM can only be made in accordance with the governance regime contained in Special Condition 4A of the licence.   Superseded versions of the PCFM are archived in these pages, but only the most recent version of the PCFM should be used for purposes that call for the most up to date position.

Below are the practical procedures for the Annual Iteration Process (AIP) that will take place by 30 November each year to calculate the value of MOD that will apply in Formula Year which starts on the first of April the following year (for example the AIP in November 2013 calculates the value of MOD that will apply in the formula year 2014/15).

Practical procedures for the Annual Iteration Process (AIP)        

RIIO Gas Distribution

The formal Annual Iteration Process is run by the Authority, but stakeholderscan ‘dummy run’ the process for themselves by following the practical procedures below.

  1. In the 'Userinterface' sheet under the heading 'PCFM year t', select 31 March 2015, since the process will calculate the value of MOD to be applied in Formula Year 2014/15.
  2. In the 'Userinterface' sheet under the heading 'Active Company' select the designator for the licensee.
  3. Update the PCFM Variable Values (‘blue box values’) on the Input Sheet for the designated licensee in accordance with revisions directed by the Authority - a consolidated direction of values will have been issued by the Authority by 30 November’.
  4. In the 'Userinterface' sheet under heading 'Model Status', select model status ‘Licence Model’.
  5. Repeat items  2-4 for other licensees as required, for example to obtain MOD values for other licensees within an ownership group.
  6. Press the ‘Run for All’ macro button (or alternatively the ‘Run for One button’ if only one licensee’s MOD value is being calculated).

The MOD value for each licensee will be recorded in the SavedResults sheet for the Formula Year 2014/15 under the heading ‘Recorded MOD’.

Publications and updates

  • Published: 30th Nov 2018
  • Decisions
  • 1 Associated documents
This is the GD1 Price Control Financial Model following the completion of the Annual Iteration Process in November 2018.

  • Published: 30th Nov 2018
  • Decisions
  • 1 Associated documents
This model will calculate the Cost of Debt variable value for all four Price Controls for the AIP 2018.

  • Published: 22nd Nov 2018
  • Guidance
  • 0 Associated documents
A summary of recent modifications to the GD1 Price Control Financial Model for 2017 and 2018

  • Published: 26th Oct 2018
  • Guidance
  • 5 Associated documents
Latest versions of the price control financial handbooks for the RIIO Network Operator incorporating changes to the pensions chapter and the implementation of PARCAs (GT only).

  • Published: 30th Aug 2018
  • Charts and data
  • 1 Associated documents
This is the GD1 Price Control Financial Model to be used for the Annual Iteration Process in November 2018.

  • Published: 30th Aug 2018
  • Decisions
  • 1 Associated documents
This direction sets out the modifications to the GD1 Price Control Financial Model with respect to the voluntary return by SGN of amount £50m in allowances.

  • Published: 27th Jul 2018
  • Open letters and correspondence
  • 3 Associated documents
This notice sets out the proposed modifications to the GD1 Price Control Financial Model with respect to the voluntary return by SGN of £50m in Repex allowances

  • Published: 30th Apr 2018
  • Decisions
  • 2 Associated documents
This model will calculate the Cost of Debt variable value for all four Price Controls for the AIP 2018.

  • Published: 13th Sep 2017
  • Decisions
  • 2 Associated documents
We confirm that the current RIIO-GD1 PCFM will be the version of the PCFM for use in AIP 2017.

  • Published: 4th Aug 2017
  • Decisions
  • 3 Associated documents
Decision to modify the RIIO-T1 and RIIO GD1 PCFMs to account for the LMP refund and the National Grid voluntary deferral.

Pages