Search

Transmission price control 2021 to 2026 (RIIO-T2)

Includes regulations, consultations and guidance on the electricity and gas transmission price controls 2021 to 2026 (RIIO-T2).

RIIO-T2 sets the revenue electricity and gas transmission network operators can make and what they must provide in return over the price control period.


 

North West and St Fergus to Teesside hydrogen Front End Engineering Design (FEED) reopener funding applications

We are seeking views on our Draft Determinations for two RIIO-2 reopener funding applications for hydrogen network Front End Engineering Design (FEED) applications from National Gas Transmission (NGT).

Published date:
Publication type: Consultation
Status: Closed (with decision)
Topic: Energy network price controls
Subtopic: Gas distribution price control 2023 to 2028 (RIIO-GD2), Transmission price control 2021 to 2026 (RIIO-T2)

Draft Determinations on RIIO-2 Re-opener Applications 2025: Electricity Transmission, Electricity Distribution and Gas Distribution

We are consulting on our Draft Determinations and draft directions for these applications.

Published date:
Publication type: Consultation
Status: Closed (awaiting decision)
Topic: Energy network price controls
Subtopic: Electricity distribution price control 2023 to 2028 (RIIO-ED2), Gas distribution price control 2023 to 2028 (RIIO-GD2), Transmission price control 2021 to 2026 (RIIO-T2)
View all RIIO-T2 consultations

RIIO-T2 publications

Includes licensing guidance, policy, news and insights.