Search

Transmission price control 2021 to 2026 (RIIO-T2)

Includes regulations, consultations and guidance on the electricity and gas transmission price controls 2021 to 2026 (RIIO-T2).

RIIO-T2 sets the revenue electricity and gas transmission network operators can make and what they must provide in return over the price control period.


 

Draft Determinations: North West and St Fergus to Teesside hydrogen Front End Engineering Design (FEED) reopener funding applications

We are seeking views on our Draft Determinations for two RIIO-2 reopener funding applications for hydrogen network Front End Engineering Design (FEED) applications from National Gas Transmission (NGT).

Published date:
Publication type: Consultation
Status: Closed (awaiting decision)
Topic: Energy network price controls
Subtopic: Gas distribution price control 2023 to 2028 (RIIO-GD2), Transmission price control 2021 to 2026 (RIIO-T2)

Draft Determinations on RIIO-2 Re-opener Applications 2025: Electricity Transmission, Electricity Distribution and Gas Distribution

We are consulting on our Draft Determinations and draft directions for these applications.

Published date:
Publication type: Consultation
Status: Closed (awaiting decision)
Topic: Energy network price controls
Subtopic: Electricity distribution price control 2023 to 2028 (RIIO-ED2), Gas distribution price control 2023 to 2028 (RIIO-GD2), Transmission price control 2021 to 2026 (RIIO-T2)
View all RIIO-T2 consultations

RIIO-T2 publications

Includes licensing guidance, policy, news and insights.