Consultation on our minded-to position to revise allowed expenditure for Subsea Cable Costs

Consultation
  • Upcoming
  • Open
  • Closed (awaiting decision)
  • Closed (with decision)

Publication date

Closing date

Industry sector

Distribution Network

Decision

Ofgem introduced a number of uncertainty mechanisms for costs that were uncertain at the time of establishing the first RIIO electricity distribution price control (RIIO-ED1), which runs from 1 April 2015 to 31 March 2023. This includes re-opener mechanisms, which enable adjustments (up or down) to electricity distribution network operators’ allowances to accommodate costs associated with specific uncertain cost categories.

This consultation sets out our minded-to position to make a positive adjustment for Scottish Hydro Electric Power Distribution (SHEPD) allowances for Subsea Cable Costs.