Offshore Transmission: Draft cost assessment for the Hornsea Project Two transmission assets
Decision
This document sets out the draft assessment of costs which ought to have been incurred in connection with the development and construction of the transmission assets for Hornsea Project Two and details the cost assessment process we have undertaken.