Search

Grid Code GC0114: System Operation Guidelines Prequalification Processes

Content:
Decision
Publication date:
Last updated:
Industry sector:
Transmission Network

This proposal seeks to modify the Grid Code to include prequalification processes, as required by the SOGL Regulation. It proposes to introduce a new section titled “Balancing Code 5 Prequalification (BC5)” into the Grid Code.

The Authority approved this modification on 9 May 2019.