Grid Code GC0114: System Operation Guidelines Prequalification Processes

Decision

Publication date

Industry sector

Transmission Network

This proposal seeks to modify the Grid Code to include prequalification processes, as required by the SOGL Regulation. It proposes to introduce a new section titled “Balancing Code 5 Prequalification (BC5)” into the Grid Code.

The Authority approved this modification on 9 May 2019.