Consultation on our Minded to Position to assign Transmission System Operator obligations under the Requirements for Generators, Demand Connection, High-Voltage Direct Current, and Forward Capacity Allocation Regulations within GB

Consultation
  • Upcoming
  • Open
  • Closed (awaiting decision)
  • Closed (with decision)

Consultation letter setting out our Minded to Position on the assignment of Transmission System Operator (TSO) obligations under the Requirements for Generators (RfG), Demand Connection (DCC), High-Voltage Direct Current (HVDC), and the Forward Capacity Allocation (FCA) Regulations.

Annex 1 sets out our Minded to Position on the allocation of TSO obligations under the RfG, DCC, HVDC and FCA Regulations.

Respond name

Jonathan Whiting

Respond telephone

Subsidiary documents