Assignment of tasks under Regulation (EU) 2017/460, the European Network Code on harmonised transmission tariff structures for gas (TAR NC)

Decision

Publication date

Industry sector

  • Transmission Network
  • Generation and Wholesale Market

TAR NC contains several requirements for which the national regulatory authority (NRA) has to decide whether the NRA or the Transmission System Operator (TSO) will perform a particular task.

This letter to BBL and IUK sets out our decision on which tasks should be performed by the NRA or TSO.