Decision to accept Uniform Network Code (UNC): UNC arrangements for the H100 Fife project (100% Hydrogen) (UNC799)

Decision
Publication date
Industry sector
Distribution Network

We have considered the issues raised by the modification proposal and the Final Modification Report (FMR) and after careful consideration decided to accept the modification with our reasons set out in the decision letter.