Consent to withdraw CMP332 and Direction to raise a new CUSC modification proposal for new Transmission Demand Residual charges for the Targeted Charging Review (TCR)

Decision

Publication date

Industry sector

  • Supply and Retail Market
  • Transmission Network

On 25 March 2020 National Grid ESO requested our consent to withdraw CUSC Modification Proposal CMP332 ‘Transmission Demand Residual bandings and allocation (TCR)’ and to review the implementation timeline for the new Transmission Demand Residual (TDR) charges for the Targeted Charging Review (TCR). This letter includes our Consent to this withdrawal and a Direction to raise a new CUSC modification that (i) enables TDR charge reforms to be effective as of 1 April 2022 and (ii) complies with the 2019 TCR Direction in all other respects.