Decision Gas Distribution Connection Charging Methodology: (CCM) Least Cost Scheme National Grid Gas (NGG 001)

Decision
Dyddiad cyhoeddi
Sector diwydiant
Distribution Network

This modification seeks to clarify the definition of least cost that is applied to the design solution for a connection to the gas distribution network which is detailed within the Connection Charging Methodology (CCM).