| 06/08/2010 | Table detailing the status of Distribution Network Operators (DNOs) use of system and Connections Charging methodology modification proposals |
| 06/08/2010 | ENW/2010/003.1 - Proposal to amend the EHV charging methodologies on Fixed, Capacity and Excess Charges |
| 29/07/2010 | Decision in relation to connection charging methodology change proposal CE/2010/01 - adoption of common connection charging methodology. |
| 29/07/2010 | Decision in relation to connection charging methodology change proposal CN/01/2010 - adoption of common connection charging methodology |
| 29/07/2010 | Decision in relation to connection charging methodology change proposal EDFE 033 - adoption of common connection charging methodology |
| 29/07/2010 | Decision in relation to connection charging methodology change proposal ENW/2010/01 - adoption of common connection charging methodology |
| 29/07/2010 | Decision in relation to connection charging methodology change proposal SPEN-10-02 - adoption of common connection charging methodology |
| 29/07/2010 | Decision in relation to connection charging methodology change proposal SSEPD/09/004 - adoption of common connection charging methodology |
| 29/07/2010 | Decision in relation to connection charging methodology change proposal WPD/ Connection/018 - adoption of common connection charging methodology |
| 29/07/2010 | Electricity distribution proposals for a common connection charging document: summary of responses - (Reference number: 96/10) |
| 12/07/2010 | ENW/2010/003 - Proposal to amend the EHV charging methodologies on Fixed, Capacity and Excess Charges (Withdrawn) |
| 08/07/2010 | UoS Mod SPEN-10-03: Amendment of Use of System Charging Methodologies for removal of blanket exemption to pre-2005 Generators (Withdrawn) |
| 08/07/2010 | CE UoS Mod 016/2010: Proposals to modify UoS Methodology - New methodology for calculating EHV generation charges. (Withdrawn) |
| 08/07/2010 | ENW/2010/002 - Proposal to amend EHV charging methodologies for designated EHV premises (Withdrawn) |
| 01/07/2010 | CN East 02/2010 – Proposals concerning use of system charging methodology – implementation of charges for pre-April 2005 generation export (Withdrawn) |
| 01/07/2010 | CN West 02/2010 – Proposals concerning use of system charging methodology – implementation of charges for pre-April 2005 generation export (Withdrawn) |
| 25/06/2010 | SSEPD/10/001 - Proposal to Amend Use of System Charging Methodology to include Pre 2005 EHV Generators (Withdrawn) |
| 17/06/2010 | WPD/WALES/WEST/UOS019 - Amendment of Use of System Charging Methodology to integrate pre April 2005 EHV Generation with post April 2005 Generation Charging - Withdrawn |
| 21/05/2010 | Electricity distribution proposals for a common connection charging document - (Reference number: 64/10) |
| 01/04/2010 | Decision in relation to EDF Energy Network's Use of System charging methodology modification EDF UoS 31 - housekeeping changes following approval of the Common Distribution Charging Methodology, and to clarify treatment of pre-2005 generators |
| 31/03/2010 | EDF Energy Networks - Changes to the Use of System Charging Methodology; for housekeeping purposes following approval of the Common Distribution Charging Methodology, and to clarify treatment of pre-2005 generators further to DCPR5 final proposals |
| 30/03/2010 | Decision in relation to Central Networks (East and West) Proposals concerning use of system charging methodology – implementation of Common Distribution Charging Methodology (04/2009 East and 04/2009 West) |
| 30/03/2010 | Decision in relation to ScottishPower (SP) Amendment of Use of System Charging Methodologies for incorporation of the Common Distribution Charging Methodology (SPEN-10-01) |
| 24/03/2010 | Scottish Power (SP) Amendment of Use of System Charging Methodologies for incorporation of the Common Distribution Charging Methodology (SPEN-10-01) |
| 24/03/2010 | Central Networks East - Proposals concerning use of system charging methodology – implementation of CDCM (04/2010) |
| 24/03/2010 | Central Networks West - Proposals concerning use of system charging methodology – implementation of CDCM (2010/04) |
| 01/03/2010 | CN East - Proposals concerning use of system charging methodology – implementation of Common Distribution Charging Methodology |
| 01/03/2010 | CN West - Proposals concerning use of system charging methodology – implementation of Common Distribution Charging Methodology |
| 23/02/2010 | Decision in relation to CE/2009/0015N and CE/2009/0015Y: Changes to UoS Charging Methodology to reflect the move to CDCM for LV and HV demand and generation customers, removal of losses methodology and general housekeeping changes |
| 19/02/2010 | Decision in relation to WPD/Wales/West/017: Proposal to amend Use of System Charging Methodologies to revoke the HV/LV Distribution Reinforcement Model (DRM) Methodology from the Implementation Date of the CDCM |
| 19/02/2010 | Decision in relation to SSEPD/09/003: Proposal to amend Use of System Charging Methodologies for incorporation of the Common Distribution Charging Methodology (CDCM) |
| 18/02/2010 | SSEPD/09/003 - Modification proposal to amend Use of System Charging Methodologies for incorporation of the Common Distribution Charging Methodology |
| 12/02/2010 | Changes to WPD's Use of System Charging Methodology to revoke the LV/HV DRM Methodology from the Implementation Date of the CDCM |
| 05/02/2010 | Decision in relation to EDF 32: proposal to clarify EDF methodology on apportionment rules |
| 02/02/2010 | CN East 02/2010 - Proposals concerning use of system charging methodology - implementation of CDCM |
| 02/02/2010 | CN West 02/2010 - Proposals concerning use of system charging methodology - implementation of CDCM |
| 26/01/2010 | CE/2009/0015N - CE NEDL UoS Charging Methodology modification proposal. Changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV from April 2010. |
| 26/01/2010 | CE/2009/0015Y - CE YEDL UoS Charging Methodology modification proposal. Changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV from April 2010. |
| 25/01/2010 | SSEPD/09/002 - Modification proposal to amend Use of System Charging Methodologies for incorporation of the Common Distribution Charging Methodology |
| 22/01/2010 | Decision in relation to ENW/2009/005.2 - Proposal to amend the EHV charging methodologies for Designated EHV premises from April 2010 (until the introduction of the EHV Distribution Charging Methodology in April 2011) |
| 14/01/2010 | Notice of intention to consult and consultation on WPD's modification proposal (WPD/Wales/West/UOS016) to introduce its charging methodology at EHV from April 2010 - (Reference number: 2/10) |
| 12/01/2010 | Changes to WPD's Use of System Charging Methodology to revoke the LV/HV DRM Methodology from the Implementation Date of the CDCM |
| 08/01/2010 | EDF 32 - Connection Charging Methodology modification proposal. Changes to clarify EDF's application of the apportionment rules in line with the other distribution network operators |
| 05/01/2010 | Decision in relation to EDF Energy Network’s UoS modification 030: changes for housekeeping purposes |
| 22/12/2009 | ENW/2009/005.2 - UoS Charging Methodology modification proposal. Changes to EHV Charging Methodology for designated EHV premises from April 2010 |
| 21/12/2009 | Notification of the Authority’s intention to consult on WPD's proposals at EHV for changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV and DPCR5 from April 2010 |
| 21/12/2009 | Decision in relation to EDFE Use of System 29: Interim tariffs for Independent Distribution Network Operators (IDNOs) |
| 11/12/2009 | WPD/Wales/West/015 - Western Power Distribution UoS Charging Methodology modification proposal. Changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV, and DPCR5, from April 2010 |
| 10/12/2009 | EDF/2009/030 - EDF UoS Charging Methodology modification proposal. Changes for house keeping purposes |
| 05/11/2009 | Decision in relation to CN's UoS Charging Methodology modification proposal 012009: Proposal to introduce interim Independent Distribution Network Operator (IDNO) tariffs |
| 05/11/2009 | Decision in relation to CE's UoS Charging Methodology modification proposal 012009: Proposal to introduce interim Independent Distribution Network Operator (IDNO) tariffs |
| 28/10/2009 | Decision in relation to Electricity North West's UoS Charging Methodology modification proposal 2009/4.2: Changes to introduce new interim boundary tariffs for IDNOs. |
| 28/09/2009 | ENW/2009/004.2 - Electricity North West UoS Charging Methodology modification proposal. Changes to the UoS Charging Methodology to implement an interim IDNO charging methodology and charges. |
| 24/09/2009 | Decision in relation to Western Power Distribution's UoS Charging Methodology modification proposal 2009/013: Changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV from April 2010. |
| 22/09/2009 | WPD/WALES/WEST/2009/013 - Western Power Distribution UoS Charging Methodology modification proposal. Changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV from April 2010. |
| 22/09/2009 | SUPERSEDED ENW/2009/005 - Electricity North West UoS Charging Methodology modification proposal. Changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV from April 2010. |
| 22/09/2009 | ENW/2009/005.1 - Electricity North West UoS Charging Methodology modification proposal. Changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV from April 2010. |
| 22/09/2009 | CE/2009/0015N - CE NEDL UoS Charging Methodology modification proposal. Changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV from April 2010. |
| 22/09/2009 | CE/2009/0015Y - CE YEDL UoS Charging Methodology modification proposal. Changes to facilitate the introduction of a Common Distribution Charging Methodology at HV and LV from April 2010. |
| 03/09/2009 | Amendment proposal to ESP Electricity Ltd’s Use of System Charging Methodology: References to Standard Licence Conditions of the Electricity Distribution Licence (ESP Mod 001) |
| 03/09/2009 | Scottish Power EnergyNetworks Electricity Distribution Use of System Charging Methodology: Interim IDNO tariffs - Decision Letter |
| 02/09/2009 | ENW 2009/005 - Electricity North West's proposal to amend it's charging methodologies for designated extra high voltage premises |
| 24/08/2009 | Consultation on proposals CE 0013N/2009 and CE 0013Y/2009 for CE Electric UK plc to introduce specific use of system (UoS) charges from Independent Distribution Network Operators (IDNOs). |
| 19/08/2009 | Consultation on 001/2009 proposal from Central Networks to implement an interim IDNO use of system charging methodology and charges |
| 14/08/2009 | Amendment proposal to Central Networks East Plc’s Connection Charging Methodology: Assessment and design fees, worked examples and indicative charge tables (CNE Mod 090715) |
| 14/08/2009 | Amendment proposal to Central Networks West Plc’s Connection Charging Methodology: Assessment and design fees, worked examples and indicative charge tables (CNW Mod 090715) |
| 12/08/2009 | Decision in relation to modification proposal SSEPD/09/001 to modify the statement of use of system charging methodology to Introduce interim IDNO tariffs. |
| 10/08/2009 | SPEN-09-03 - Amendment of Scottish Power Energy Network's Use of System Charging Methodologies for IDNO networks |
| 06/08/2009 | ESP1 - ESP Electricity Ltd - Modification proposal concerning Use of System Charging Methodology house keeping changes |
| 27/07/2009 | SSEPD/09/001 - Modification of Scottish Hydro Electric Power Distribution and Southern Electric Power Distribution's Use of System Charging Methodology to introduce a specific methodology for licensed IDNO networks |
| 21/07/2009 | 01/2009 East - Proposal to amend Central Networks East's use of system charging methodology - system charges for licensed embedded network operators |
| 21/07/2009 | 01/2009 West - Proposal to amend Central Networks West's use of system charging methodology - system charges for licensed embedded network operators |
| 21/07/2009 | EDF Energy Networks’ UoS mod 28 - Modification Request on changes to the Use of System Charging Methodology to provide interim IDNO charges. |
| 21/07/2009 | CN West 090715 - Central Networks West's proposal to modify Section 7 of its Connection Charging Methodology |
| 21/07/2009 | CN East 090715 - Central Networks East's proposal to modify Section 7 of its Connection Charging Methodology |
| 16/07/2009 | CE Electric proposal to introduce interim Independent Distribution Network Operator (IDNO) tariffs |
| 30/06/2009 | Consultation on Electricity North West's interim Independent Distribution Network Operators (IDNO) charging methodology - (Reference number: 76/09) |
| 24/06/2009 | Notification of the Authority’s intention to consult on ENW's Interim Use of System Independent Distribution Network Operator (IDNO) charges |
| 16/06/2009 | ENW/2009/004.1 - Revised proposal to modify ENW's Use of System Charging Methodology to implement interim IDNO charges |
| 10/06/2009 | ENW/2009/004 - Proposal to modify ENW's Use of System Charging Methodology to implement interim IDNO charges |
| 09/06/2009 | Decision in relation to modification proposal UoS 012 to modify the statement of use of system charging methodology by introducing revised IDNO charges - WPD South Wales |
| 06/05/2009 | Decision in relation to EDF EnergyNetworks Ltd (EDFEN) use of system charging methodology modification proposal 27: Capacity management for Licensed Distribution Network Operators (LDNOs) |
| 06/05/2009 | Decision in relation to EDF Energy Networks Limited connection charging methodology modification proposal 26: Capacity management for Licensed Distribution Network Operators (LDNOs) |
| 23/04/2009 | Decision in relation to Western Power Distribution (WPD) South Wales plc proposal: Modification to Connection Charging Methodology (WPD/011) |
| 23/04/2009 | Decision in relation to Western Power Distribution (WPD) South West plc proposal: Modification to Connection Charging Methodology (WPD/011) |
| 09/04/2009 | WPD/WALES/WEST/UoS012 - Proposed modification to WPDs Use of System Charging Methodology to base IDNO charges on a discount derived from price control data |
| 30/03/2009 | WPD/011 - Proposal to modify WPD South West and WPD South Wales Connection Charging Methodologies - Housekeeping Changes |
| 16/03/2009 | EDFE 024 - Proposed capacity management changes to EDFE’s Connection Charging Methodology |
| 16/03/2009 | EDFE 025 - Proposed capacity management changes to EDFE’s Use of System Charging Methodology |
| 13/03/2009 | SPEN-09-01 - Proposed capacity ramping changes to Scottish Power Energy Network's Distribution Connection Charging Methodology - SP Manweb and SP Distribution |
| 13/03/2009 | SPEN-09-02 - Proposed capacity ramping changes to Scottish Power Energy Network's Distribution Use of System Charging Methodology - SP Manweb and SP Distribution |
| 11/03/2009 | Decision in relation to Electricity North West Limited (“ENW”) limited connection charging methodology modification proposal 2009-003: Capacity management |
| 11/03/2009 | Decision in relation to Electricity North West Limited (“ENW”) for use of system charging methodology modification proposal 2009-003: Capacity management |
| 11/03/2009 | Decision in relation to Southern Electric Power Distribution plc (“SEPD”) connection charging methodology modification proposal 08003: Capacity management |
| 11/03/2009 | Decision letter in relation to Southern Electric Power Distribution (SEPD) Use of System charging modification 08004: Capacity ramping |
| 11/03/2009 | Decision in relation to Scottish Hydro Electric Power Distribution plc (“SHEPD”) connection charging methodology modification proposal 08003: Capacity management |
| 11/03/2009 | Decision letter in relation to Use of System Scottish Hydro Electric Power Distribution (SHEPD) plc charging modification 08004: capacity ramping |
| 11/03/2009 | Authority decision on the form of Use of System Charging Statement |
| 10/03/2009 | Decision in relation to Scottish Hydro Electric Power Distribution (SHEPD) plc connection charging methodology modification proposal SHEPD/08/002b : Housekeeping changes. |
| 10/03/2009 | Decision in relation to Southern Electric Power Distribution (SEPD) plc connection charging methodology modification proposal SEPD/08/002b : Housekeeping changes. |
| 26/02/2009 | SEPD/08/002c - Proposed housekeeping revisions to Southern Electric Power Distribution’s Connection Charging Methodology |
| 26/02/2009 | SHEPD/08/002c - Proposed housekeeping revisions to Scottish Hydro Electric Power Distribution’s Connection Charging Methodology |
| 16/02/2009 | ENW-2009-003 - Proposed modifications to amend the existing approach to capacity management for LDNO connections in ENWs Connection Charging Methodology and Use of System Charging Methodology |
| 16/02/2009 | SEPD-08-003 - Connection Charging Methodology Capacity Ramping Modification |
| 16/02/2009 | SEPD-08-004 - Proposed capacity ramping changes to SEPD's Use of System Charging Methodology |
| 16/02/2009 | SHEPD-08-003 - Proposed capacity ramping changes to SHEPD's Connection Charging Methodology |
| 16/02/2009 | SHEPD-08-004 - Proposed capacity ramping changes to SHEPD's Use of System Charging Methodology |
| 06/02/2009 | Decision in relation to Western Power Distribution (WPD) South Wales plc connection charging methodology modification proposal 009: Capacity management for Licensed Distribution Operators (LDNOs) |
| 06/02/2009 | Decision in relation to Western Power Distribution (WPD) South West plc connection charging methodology modification proposal 009: Capacity management for Licensed Distribution Network Operators (LDNOs) |
| 06/02/2009 | Decision in relation to Western Power Distribution (WPD) South Wales plc for use of system charging methodology modification proposal 010: Capacity management for Licensed Distribution Network Operators (LDNOs) |
| 06/02/2009 | Decision in relation to Western Power Distribution (WPD) South West plc for use of system charging methodology modification proposal 010: Capacity management for Licensed Distribution Network Operators (LDNOs) |
| 02/02/2009 | SEPD08002b - Proposed housekeeping revisions to Southern Electric Power Distribution’s Connection Charging Methodology |
| 02/02/2009 | SHEPD08002b - Proposed housekeeping revisions to Scottish Hydro Electric Power Distribution’s Connection Charging Methodology |
| 22/01/2009 | WPD/010 - Proposal to modify WPD S. Wales and WPD S. West Use of System charging methodologies to allow ramping of required capacity by a licensed distribution network operators wishing to connect embedded networks |
| 22/01/2009 | WPD/WALES/009 - Proposal to modify WPD S. Wales and WPD S. West’s Connection Charging Methodologies to allow ramping of the required capacity by a licensed distribution network operators wishing to connect embedded networks. |
| 22/01/2009 | SEPD08002a - Proposed general revisions within the approved Statement of Charging Methodology for Connection to Southern Electric Power Distribution plc’s Distribution System: 2008-09 |
| 22/01/2009 | SHEPD08002 Proposed general revisions within the approved Statement of Charging Methodology for Connection to Scottish Hydro Electric Power Distribution plc’s Distribution System: 2008-09 |
| 09/12/2008 | Decision in relation to EDF Energy Networks modification proposal EDFE 023: cessation of upfront charging of Assessment and Design (A&D) Fees |
| 14/11/2008 | EDFE 023 - EDFE proposal to modify the Connection Charging Methodology - cessation of upfront charging of Assessment and Design (A&D) |
| 12/11/2008 | Decision in relation to modification proposal to modify Electricity North West Limited’s charging methodology: 2009/001/1 |
| 03/11/2008 | EDFE 022 - EDFE proposal to modify the Connection Charging Methodology - cessation of upfront charging of Assessment and Design (A&D) |
| 24/10/2008 | Decision in relation to Western Power Distribution (South Wales) Plc (“WPD”) modification proposal 008/001: Clarification of A & D fees. |
| 24/10/2008 | Decision in relation to Western Power Distribution (South West) Plc (“WPD”) modification proposal 008/001: Clarification of A & D fees. |
| 07/10/2008 | SPD Housekeeping Mod COM-08-001a Decision Letter |
| 07/10/2008 | SPD Reinforcement Mod COM-08-002a Decision Letter |
| 07/10/2008 | SPM Housekeeping Mod COM-08-001b Decision Letter |
| 07/10/2008 | SPM Reinforcement Mod COM-08-002b Decision Letter |
| 25/09/2008 | WPD/WALES/008 - WPD Wales proposal to modify the connections charging methodology: Clarification relating to A & D Fees |
| 25/09/2008 | WPD/WEST/008 - WPD West proposal to modify the connections charging methodology: Clarification relating to A & D Fees |
| 15/09/2008 | COM-08-001a - SP Distribution proposal to modify the connections charging methodology: Housekeeping changes |
| 15/09/2008 | COM-08-001b - SP Manweb proposal to modify the connections charging methodology: Housekeeping changes |
| 15/09/2008 | COM-08-002a - SP Distribution proposal to modify the connections charging methodology: Reinforcement Apportionment Rules |
| 15/09/2008 | COM-08-002b - SP Manweb proposal to modify the connections charging methodology: Reinforcement Apportionment Rules |
| 05/09/2008 | Decision in relation to SP's (SPD) modification proposal PR-08-002: Implementation of the 'G3' Use of System Charging Methodology |
| 05/09/2008 | Decision in relation to SP's (SPM) modification proposal PR-08-002: Implementation of the 'G3' Use of System Charging Methodology |
| 05/09/2008 | Decision in relation to use of system methodology modification proposal EDFE 021: Introduction of a power flow/LRIC based methodology along with HV/LV generator charging in EDF Energy Networks Limited's (EDF) south east (SPN) network area |
| 27/08/2008 | Decision in relation to modification proposal SEPD/08/001A : Cost Apportionment Rules and Housekeeping Changes (SEPD) |
| 27/08/2008 | Decision in relation to modification proposal SHEPD/08/001A : Cost Apportionment Rules and Housekeeping Changes (SHEPD) |
| 22/08/2008 | Consultation and impact assessment on ENW/2009/001.1 ENW proposal to modify their Use of System Charging methodology Package Mod: revised DRM for Service Model, Cost Allocation, Revenue Reconciliation, IDNO tariffs and HV/LV generator tariffs - (Reference number: 125/08) |
| 07/08/2008 | SHEPD/08/001A Proposal to modify the connections charging methodology: Amending the description of Cost Apportionment Rules and housekeeping changes |
| 01/08/2008 | Decision in relation to modification proposal PR-008-001a: Amendment of use of system charging methodologies for IDNO networks (SPD) |
| 01/08/2008 | Decision in relation to modification proposal PR-008-001a: Amendment of use of system charging methodologies for IDNO networks (SPM) |
| 15/07/2008 | Decision in relation to modification proposal 0010N/2008: Apportionment rule housekeeping |
| 15/07/2008 | Decision in relation to modification proposal 0010Y/2008: Apportionment rule housekeeping |
| 15/07/2008 | Decision in relation to modification proposal 0011N/2008: One voltage level above the point of connection |
| 15/07/2008 | Decision in relation to modification proposal 0011Y/2008: One voltage level above the point of connection |
| 15/07/2008 | Decision in relation to modification proposal 0012N/2008: Initial contributor housekeeping |
| 15/07/2008 | Decision in relation to modification proposal 0012Y/2008: Initial contributor housekeeping |
| 02/07/2008 | PR-08-003 Scottish Power - IDNO charging proposal under a G3 methodology |
| 02/07/2008 | Consultation and impact assessment on EDFs proposal to introduce a revised methodology for its SPN network:LRIC model and HV/LV generator charging - (Reference number: 95/08) |
| 17/06/2008 | Consultation on Scottish Power’s (SP) proposal for a longer term charging methodology: FCP model - (Reference number: 86/08) |
| 12/06/2008 | Decision in relation to proposal ENW-2009-002 to modify the connection charging statement: System study charges |
| 02/06/2008 | EDFE 021: EDF Energy Networks UoS Charging Methodology Modification. Introduction of a power flow/LRIC based methodology and implementation in EDF Energy Networks’ south East Region |
| 16/05/2008 | ENW 2009-002: Proposal to modify the connection charging methodology and statements: system study charges |
| 14/05/2008 | ENW 2009-001: proposal to modify the statement of use of system charging methodology: introduction of LDNO tariffs and HV/LV generator tariffs |
| 09/05/2008 | SP PR 08 002: proposal to modify the use of system charging methodology: introduction of FCP model |
| 06/05/2008 | Consultation on proposals from Scottish Power Distribution and Scottish Power Manweb to modify Use of System charges for Independent Distribution Network Operators (IDNOs) - (Reference number: 59/08) |
| 02/05/2008 | Authority's intention to consult on SPM PR-08-001a IDNO charging arrangements |
| 01/05/2008 | SP PR 08 001a proposal to modify the statement of use of system charging methodology: IDNO charging |
| 01/05/2008 | Authority's intention to consult on SPD PR-08-001a IDNO charging arrangements |
| 07/04/2008 | CNE 2008 02: decision relating to a modification to the statement of use of system charging methodology: capacity build-up on embedded networks |
| 07/04/2008 | CNW 2008 02: decision relating to a modification to the statement of use of system charging methodology: capacity build-up on embedded networks |
| 07/04/2008 | CNE 2008 03: decision relating to a modification to connection charging methodology and statement: capacity build-up on embedded networks |
| 07/04/2008 | CNW 2008 03: decision relating to a modification to connection charging methodology and statement: capacity build-up on embedded networks |
| 07/04/2008 | CE 2008 0008N: decision in relation to a modification to the connection charging methodology and statement: removal of references to P2/5 and IUS |
| 07/04/2008 | CE 2008 0008Y: decision in relation to a modification to the connection charging methodology and statement: removal of references to P2/5 and IUS |
| 07/04/2008 | CE 2008 0009N: decision in relation to a modification to the connection charging methodology and statement: contestability of live jointing on unmetered connections |
| 18/03/2008 | CNE 004: decision relating to a modification to the connection charging methodology: CAF clarification |
| 18/03/2008 | CNW 004: decision relating to a modification to the connection charging methodology: CAF clarification |
| 08/02/2008 | Decision in relation to ENW/2008/004 modification proposal to UoS charging methodology statement: update to Distributed Generation methodology |
| 08/02/2008 | Decision in relation to ENW/2008/005 modification proposal to connection charging methodology statement: update non-contestable charges |
| 08/02/2008 | Decision in relation to ENW/2008/006 modification proposal to revise the interactive connection applications methodology |
| 08/02/2008 | Decision in relation to ENW/2008/007 modification proposal to connection charging methodology: revision of connection offer validity period |
| 08/02/2008 | Decision in relation to ENW/2008/008 modification proposal to connection charging statement: clarification of land rights and acquisitions methodology |
| 08/02/2008 | Decision in relation to ENW/2008/009 modification proposal to connection charging methodology statement: housekeeping changes (name change) |
| 08/02/2008 | Decision in relation to ENW/2008/010 modification proposal to UoS charging methodology statement: housekeeping changes (name change) |
| 28/01/2008 | Decision in relation to Central Networks modification proposal CN003 to the connection charging methodology: clarification of the apportionment rules |
| 28/01/2008 | Decision letter in relation to modification proposal to the connection charging methodology: clarification of the apportionment rules |
| 16/01/2008 | Decision in relation to CNE Dec 07: modification proposal to UoS methodology statement: New IDNO specific tariffs |
| 16/01/2008 | Decision in relation to CNW Dec 07: modification proposal to UoS charging methodology: New IDNO specific tariffs |
| 17/12/2007 | Decision in relation to WPD S Wales 006: modification proposal to the UoS charging methodology statement: New tariffs for IDNOs |
| 26/10/2007 | Decision in relation to proposal UU/2008/002.1 to modify connection charging methodology: introduction of asset adoption payments |
| 25/10/2007 | Decision in relation to UU/2008/003: modification proposal to use of system charging methodology: housekeeping update to example yardstick values |
| 12/10/2007 | Decision on modification proposal to UoS charging methodology - WPD/WALES/WEST/UOS005 |
| 30/07/2007 | Decision in relation to modification proposal UU/2008/001: to connection charging methodology: to revise the form of non contestable charges |
| 27/07/2007 | Decision in relation to EDFE 019: modification proposal to connection charging methodology: clarification of Point of Connection |
| 27/07/2007 | Authority's intention to consult on UU/2008/002.1: asset adoption payments |
| 20/07/2007 | EDFE 013, 015, 017 & 19: proposed new methodology statement (track changed) |
| 16/07/2007 | Decision in relation to EDFE013: modification proposal to connection charging methodology: Clarification of NGET connection charges |
| 16/07/2007 | Decision in relation to EDFE 015: modification proposal to connection charging methodology: Clarification of CAF rule |
| 16/07/2007 | Decision in relation to EDFE 017: modification proposal to connection charging methodology: General housekeeping |
| 13/07/2007 | Decision in relation to SP COM 07 001: Amendments to use of system charging methods for IDNO networks |
| 13/07/2007 | Decision in relation to WPD/WEST/WALES/UOS003: changes to UoS charging methodology to incorporate IDNO networks and consequential changes to the form of the UoS charging statement |
| 20/06/2007 | EDFE 013: modification proposal to connection charging methodology: Clarification of NGET exit charges |
| 20/06/2007 | EDFE 015: modification proposal to connection charging methodology: Clarification of CAF rule |
| 12/06/2007 | Decision in relation to modification proposal: EDFE 11 to UoS charging methodology: EHV transition |
| 15/05/2007 | Decision in relation to CE Electric UK modification proposal 0007/2007 to the use of system charging methodology: revision to reflect the allocation of operating costs to the unmetered supplies customer group (YEDL) |
| 08/05/2007 | 114/07 Consultation on use of system charges to new electricity distribution licensees:WPD and SP proposals - (Reference number: 114/07) |
| 25/04/2007 | Decision in relation to UU_2007_007.1: General housekeeping to connection charging methodology |
| 24/04/2007 | Decision in relation to connection charging methodology proposal: UU 2007 006: Clarification of security CAF rule |
| 01/02/2007 | 20/07 Decision in relation to Western Power Distribution's proposal to modify their Electricity Distribution Use of System Charging Model - Western Power Distribution (South West) plc - (Reference number: 20/07) |
| 01/02/2007 | 20a/07 Decision in relation to Western Power Distribution's proposal to modify their Electricity Distribution Use of System Charging Model - Western Power Distribution (South Wales) plc - (Reference number: 20a/07) |
| 24/01/2007 | Decision in relation to modification proposal: EDFE 09 to use of system charging methodology: transition of EHV site specific charges |
| 18/01/2007 | Decision in relation to modification proposal to connection charging methodology: WPD/WEST/006 clarification relating to incremental increases in Required Capacity |
| 18/01/2007 | Decision relating to modification proposal WPD/WALES/006 to connection charging methodology statement: clarification relating to incremental increases in Required Capacity |
| 18/01/2007 | Decision relating to modification proposal to connection charging methodology WPD/WEST/007: clarification relating to the contestability of non-electrical off site work |
| 18/01/2007 | Decision in relation to modification proposal WPD/WALES/007: clarification relating to the contestability of non-electrical off-site work |
| 21/12/2006 | CNW Mod 001: modification proposal to connection charging methodology: update/addition of indicative charges |
| 21/12/2006 | CNE Mod 001: modification proposal to connection charging methodology: update/addition of indicative charges |
| 16/12/2006 | Impact assessment and consultation on Western Power Distribution's Modification Proposal to change their Electricity Distribution Use of System Charging Model - Ref: WPD/WALES/WEST/UOSOO2A - (Reference number: 214/06) |
| 15/12/2006 | Decision in relation to modification proposal EDF UoS Mod 04: housekeeping (branding and naming conventions) |
| 15/12/2006 | Decision in relation to modification proposal EDF UoS Mod 05: housekeeping (instructions for locating documents on the website) |
| 15/12/2006 | Decision in relation to modification proposal EDF UoS Mod 06: housekeeping (consistency of abbreviating National Grid to NGET) |
| 15/12/2006 | Decision in relation to modification proposal EDF UoS Mod 07: disturbance constraints on generation use of system charges |
| 11/12/2006 | Decision in relation to modification proposal SEPD/06/004A to connection charging methodology: extending the scope of contestable connections |
| 11/12/2006 | Decision in relation to modification proposal SHEPD/06/004B to connection charging methodology: extending the scope of contestable connections |
| 11/12/2006 | WPD/Wales/UOS002A: modification proposal to use of system charging methodology: implementation of Long run incremental cost (LRIC) and Distribution reinforcement model (DRM) methodologies |
| 11/12/2006 | WPD/West/UOS002A: modification proposal to use of system charging methodology: implementation of the combined Long run incremental cost and Distribution reinforcement model (DRM) methodologies |
| 01/12/2006 | Decision in relation to modification proposal UU_001 to connection charging methodology: revised worked examples |
| 01/12/2006 | Decision in relation to modification proposal UU_003 to connection charging methodology: clarification of NGET generators |
| 01/12/2006 | Decision in relation to modification proposal UU_004 to connection charging methodology: clarification of competitive connections activity |
| 01/12/2006 | Decision in relation to modification proposal UU_005 to the connection charging methodology: Extending contestability of reinforcement and diversionary works associated with a connection |
| 28/11/2006 | Decision in relation to modification proposal CE 0006N/2006: extension of contestability in reinforcement and diversions |
| 28/11/2006 | Decision in relation to modification proposal CE 0006Y/2006: extension of contestability in reinforcement and diversions |
| 16/11/2006 | Decision in relation to modification proposal SHEDP 06/003A to connection charging methodology: high cost amendment |
| 16/11/2006 | Decision in relation to modification proposal SEPD 06/003B to connection charging methodology: high cost amendment |
| 02/11/2006 | Decision in relation to modification proposal SEPD 06/002 to connection charging methodology: general housekeeping |
| 02/11/2006 | Decision in relation to modification proposal SHEDP 06/002 to connection charging methodology: general housekeeping |
| 31/10/2006 | Decision in relation to modification proposal CE NEDL 0003/2006 to use of system charging methodology: clarification of treatment of EHV |
| 31/10/2006 | Decision in relation to modification proposal CE YEDL 0003/2006 to use of system charging methodology: clarification of treatment of EHV |
| 31/10/2006 | Decision in relation to modification proposal CE NEDL 0004/2006 to use of system charging methodology: revised contractual arrangements |
| 31/10/2006 | Decision in relation to modification proposal CE YEDL 0004/2006 to use of system charging methodology: revised contractual arrangements |
| 31/10/2006 | Decision in relation to modification proposal: CE YEDL 0005/2006 to the use of system charging methodology: revised EHV migration |
| 31/10/2006 | Decision in relation to modification proposal CE NEDL 0005/2006 to use of system charging methodology: revised EHV migration |
| 30/10/2006 | Decision in relation to modification proposal CNW to connection charging methodology: small and medium embedded power stations |
| 30/10/2006 | Decision in relation to modification proposal CNE to connection charging methodology: small and medium embedded power stations |
| 30/10/2006 | Decision in relation to modification proposal: CNW to connection charging methodology: clarification of diversionary works |
| 30/10/2006 | Decision in relation to modification proposal: CNE to connection charging methodology: clarification of diversionary works |
| 30/10/2006 | Decision in relation to modification proposal: CNW to connection charging methodology clarification of the Voltage rule |
| 30/10/2006 | Decision in relation to modification proposal: CNE to connection charging methodology: clarification of the Voltage rule |
| 25/10/2006 | Decision in relation to modification proposal WPD S.Wales UOS 001 to the use of system charging methodology: removal of GDUoS for generation associated with connection supplied under profiles 1-4 |
| 25/10/2006 | Decision in relation to modification proposal WPD S.West UOS 001 to the use of system charging methodology: removal of GDUoS for generation associated with connection supplied under profiles 1-4 |
| 23/10/2006 | Decision in relation to modification proposal SPD COM 006 001 to connection charging methodology: clarification of reasonable rate of return |
| 23/10/2006 | Decision in relation to modification proposal SPM COM 006 001 to connection charging methodology: clarification of reasonable rate of return |
| 23/10/2006 | Decision in relation to modification proposal SPD COM 006 002 to connection charging methodology: clarification of reinforcement apportionment rules |
| 23/10/2006 | Decision in relation to modification proposal SPM COM 006 002 to connection charging methodology: clarification of reinforcement apportionment rules |
| 23/10/2006 | Decision in relation to modification proposal SPM COM-06-003 to connection charging methodology: extending the scope of contestable works |
| 23/10/2006 | Decision in relation to modification proposal SPD COM-06-003 to connection charging methodology: extending the scope of contestable works |
| 23/10/2006 | Decision in relation to modification proposal SPD COM 006 004 to connection charging methodology: inclusion of small embedded power stations |
| 23/10/2006 | Decision in relation to modification proposal SPM COM 006 004 to connection charging methodology: inclusion of small and medium embedded power stations |
| 23/10/2006 | Decision in relation to modification proposal SPM COM 006 005 to connection charging methodology: clarification of application fees |
| 23/10/2006 | Decision in relation to modification proposal SPD COM 006 005 to connection charging methodology: clarification of application fees |
| 23/10/2006 | Decision in relation to modification proposal SPD COM-06-006 to connection charging methodology: general housekeeping |
| 23/10/2006 | Decision in relation to modification proposal SPM COM-06-006 to connection charging methodology: general housekeeping |
| 20/10/2006 | Decision in relation to modification proposal: WPD S.West 005 to connection charging methodology: clarification of the voltage rule |
| 20/10/2006 | Decision in relation to modification proposal: WPD S.Wales 005 to connection charging methodology: clarification of the voltage rule |
| 12/09/2006 | Decision in relation to modification proposal: WPD S.West 002 to the connection charging methodology: extension of contestability for diversionary and reinforcement works |
| 12/09/2006 | Decision in relation to modification proposal: WPD S.Wales 002 to the connection charging methodology: extension of contestability for diversionary and reinforcement works |
| 12/09/2006 | Decision in relation to modification proposal: WPD S.Wales 003 to the connection charging methodology: clarification of charges for reinforcement |
| 12/09/2006 | Decision in relation to modification proposal WPD S.West 003 to the connection charging methodology: clarification of charges for reinforcement |
| 12/09/2006 | Decision in relation to modification proposal WPD S.Wales 004 to the connection charging methodology: clarification of the voltage rule and incremental increases |
| 12/09/2006 | Decision in relation to modification proposal : WPD S.West 004 to the connection charging methodology: clarification of the voltage rule and incremental increases |
| 05/09/2006 | EDFE (EPN) - decision in relation to modification proposal: EDFE 002 to the Connection charging methodology: General housekeeping including clarification of contestable works |
| 05/09/2006 | EDFE (SPN) - decision in relation to modification proposal: EDFE 002 to the connection charging methodology: general housekeeping including clarification of contestable works |
| 05/09/2006 | EDFE (LPN) - decision in relation to modification proposal: EDFE 002 to the connection charging methodology: general housekeeping including clarification of contestable works |
| 10/08/2006 | CE NEDL - decision in relation to modification proposal: Mod0001 to the Use of System Charging Methodology: Clarification of the EHV asset valuation and OR'quot;amp;M calculation for dedicated assets |
| 10/08/2006 | CE YEDL - decision in relation to modification proposal to the Use of System Charging Methodology: Mod0001 Clarification of the EHV asset valuation and OR'quot;amp;M calculation for dedicated assets |
| 02/08/2006 | WPD S.Wales - decision in relation to modification proposal: WPD/S.Wales 001 to the Connection charging methodology: Housekeeping changes to Contestability status for Design of New Connections |
| 02/08/2006 | WPD S.West - decision in relation to Modification proposal WDP/West 001: to the Connection charging methodology: Mod 001 Housekeeping change to Constestability status for Design of New Connections |
| 12/04/2006 | EDFE 001: decision in relation to modification proposal to the use of system charging methodology |
| 21/03/2006 | CN West - decision in relation to modification proposal: Mod005 to the Use of System Charging Methodology: Reactive power charges |
| 21/03/2006 | CN East - decision in relation to modification proposal: Mod005 to the Use of System Charging Methodology: Reactive power charges |
| 21/03/2006 | SSE SEPD - decision in relation to modification proposal: SEPD/06/001 to the Connection and Charging Methodology: Housekeeping changes |
| 21/03/2006 | SSE SHEPD: decision in relation to modification proposal: SHEPD/06/001 to the Connection and Charging Methodology: Housekeeping changes |
| 15/03/2006 | United Utilities: decision in relation to modification proposal UU/005.1 to the Connection Charging methodology: Housekeeping changes |
| 14/03/2006 | United Utilities:decision in relation to Modification Proposal UU/002.1 to the Use of System Charging Methodology:Reactive power charges |
| 28/02/2006 | United Utilities: decision in relation to modification proposal UU/005 to the Connection Charging Methodology: General housekeeping changes |
| 22/02/2006 | Decision letter on Electricity Distribution Use of System Charging Modification Proposals: Central Networks West Mod002 - Reactive power charges |
| 22/02/2006 | Decision letter on Electricity Distribution Use of System Charging Modification Proposals: Central Networks East Mod002 - Reactive power charges |
| 22/02/2006 | Decision letter on Electricity Distribution Use of System Charging Modification Proposals: United Utilities UU/002 - Reactive power charges |
| 15/02/2006 | Decision letter on Electricity Distribution Use of System Charging Modification Proposal: Central Networks East Mod003 - Excess capacity charges |
| 15/02/2006 | Decision letter on Electricity Distribution Use of System Charging Modification Proposal: Central Networks West Mod003 - Excess capacity charges |
| 19/12/2005 | United Utilities - decision in relation to modification proposal UU/003 to the use of system charging methodology: housekeeping changes |
| 15/12/2005 | Consultation on electricity distribution use of system charging modification proposal: Central Networks - excess capacity charges Mod003 - (Reference number: 268/05) |
| 06/12/2005 | SP Manweb - decision in relation to modification proposal COM-05-001 to the use of system charging methodology: metering charges to IDNOs |
| 06/12/2005 | SP Distribution - decision in relation to modification proposal COM-05-006 to the use of system charging methodology: metering charges to IDNOs |
| 06/12/2005 | SP Manweb - decision in relation to modification proposal COM-05-002 to the use of system charging methodology: housekeeping changes |
| 06/12/2005 | SP Distribution - decision in relation to modification proposal COM-05-007 to the use of system charging methodology: housekeeping changes |
| 05/12/2005 | SP Distibution- decision in relation to modification proposal COM-05-008 to the connection charging methodology: charges for providing a generator |
| 05/12/2005 | SP Distribution- decision in relation to modification proposal COM-05-009 to the connection charging methodology: transmission system associated works |
| 05/12/2005 | SP Manweb - decision in relation to modification proposal COM-05-003 to the connection charging methodology: charges for providing a generator |
| 05/12/2005 | SP Manweb - decision in relation to modification proposal COM-05-004 to the connection charging methodology: transmission system associated works |
| 02/12/2005 | SP Manweb - decision in relation to modification proposal COM-05-005 to the connection charging methodology: clarification of approach in the application of the reinforcement of the apportionment rules |
| 02/12/2005 | SP Distribution - decision in relation to modification proposal COM-05-010 to the connection charging methodology: clarification of approach in the application of the reinforcement apportionment rules |
| 01/12/2005 | Consultation on electricity distribution reactive power charges - Central Networks and United Utilities - (Reference number: 260/05) |
| 24/11/2005 | Guidance for DNOs and users on the connection and use of system charging methodology modification process |
| 24/11/2005 | WPD - decision in relation to modification proposal to the use of system charging methodology: clarification of approach |